Central Bank of Cyprus

Share:

Central Bank of Cyprus

Short Description:

Project Info:
Satchwell Sigma software with graphics integrated to Invensys Network 8000 was installed. All controls and software PCs were connected on a fast Ethernet backbone network.

 Description:

HVAC equipment installed:

  • 250 – VAV boxes
  • 8 – AHU
  • 4 – Chillers
  • 2 – Boilers
  • 10 – Primary Pumps
  • 14 – Secondary Pumps

BMS equipment installed:

  • 7    – Global Control Modules
  • 20 – Local Control Modules
  • 250 – Microflo VAV Controllers
  • 4    – UNC 496 Sigma Controllers
  • 2    – UNC 532 Sigma Controllers