Short Description:
Project Info:
Eight floor building with offices, including presentation rooms, money museum and cafeteria. The HVAC equipment as well as the space air conditioning VAV system is controlled from a single office using the InVue software.
Description:
HVAC major equipment installed:
- 200 – VAV Boxes
- 9 – AHU
- 4 – Chillers
- 2 – Boilers
- 12 – Primary Pumps
- 16 – Secondary Pumps
BMS equipment installed:
- 7 – Global Control Modules
- 20 – Local Control Modules
- 200 – Microflo / MicroNet VAV controllers
- InVue Software with Graphics, Alarms, Reports
- Central Station (computer, printers)