Short Description:
Project Info:
The biggest and most expensive project ever done in Cyprus at the time, occupying 102,000 m² with 10500 BMS points.
Description:
This project was a great challenge for Comfort Reliance Group. Different types of installations from different manufacturers had to be connected and controlled from a single station. An open system was used with Satchwell Sigma software and graphics. McQuary Chillers, Invensys VAV Controllers, Satchwell Lon Controllers and Liebert Control Units have been interfaced with Sigma software. This software enables the system to operate successfully through a single station.
HVAC major equipment installed:
- 750 – VAV Boxes
- 105 – AHUs
- 24 – Chillers
- 3 – Steam Boilers
- 24 – Cooling Pumps
- 22 – Heating Pumps
- 5 – Hot Water Cylinders
- 7 – Heat Exchangers
- 800 – FCUs
- 280 – Ex. Fans
BMS equipment installed:
- 750 – VAV Controllers
- 423 – MicroNet DDC Controllers
- 6 – Global Control Modules
- 4 – DNN Routers
- 14 – Lon Integration Controllers
- Modbus Integration Controller
- 20 – MicroZone Controllers
- Sigma Software with Graphics
- Central Station (2 computers, printers)