Case Studies Listing

09 Jan 2017

Supreme Court Of Cyprus

Project Info:
A rather modern complex building with offices, 10 small and 2 large court rooms, library and a general assembly meeting room. 
09 Jan 2017

New Nicosia General Hospital

Project Info:
The biggest and most expensive project ever done in Cyprus at the time, occupying 102,000 m² with 10500 BMS points. 
09 Jan 2017

Larnaca Airport Control Tower

Project Info:
The Control Tower at the new Larnaca Airport, is a building with unique characteristics. 
09 Jan 2017

Laiki Bank HQ

Project Info:
A modern building with open plan office areas. It was a challenge to control the HVAC system due to the building’s complexity. Indoor and outdoor lighting is also controlled from the BMS. 
09 Jan 2017

Tigris - Central Bank of Nigeria

Project Info:
Seven floor office complex of the Central Bank of Nigeria located at Tigris area in Abuja, Nigeria. 
09 Jan 2017

Hilton Park Hotel

Project Info:
A luxurious hotel in Nicosia. In order to control, keep comfort at high demand and keep energy consumption at low level, we used MicroNet and DMS Building Management System with MicroNet View Software. 
09 Jan 2017

Bank of Cyprus HQ

Project Info:
Eight floor building with offices, including presentation rooms, money museum and cafeteria. The HVAC equipment as well as the space air conditioning VAV system is controlled from a single office using the InVue software. 
09 Jan 2017

Ministry Of Finance

Project Info:
A 20,000 m² Cyprus Government building of 2100 BMS points with offices and meeting rooms. 
02 Jan 2017

Central Bank of Cyprus

Project Info:
Satchwell Sigma software with graphics integrated to Invensys Network 8000 was installed. All controls and software PCs were connected on a fast Ethernet backbone network. 
09 Mar 2016

Piraeus Bank Cyprus

Project info:
The Building Management System has a major role in this modern office building located in the capital city center. 
09 Mar 2016

Distric Cooling Control - Gulf Hotel Bahrain

District Cooling System Control – Gulf Hotels Group Bahrain

The district cooling system is located in and around the premises of the Gulf Hotel Complex in Juffair area of Bahrain. 
09 Mar 2016

Arataeio Private Hospital

Project info:
Comprised of 6 floors covering a total area of 12000m2, providing 70 patient beds, 4 operating theatres and offering almost all the medical specialities. 

 
  3 Erehthiou Street
     Strovolos, 2048
     Offices 201-202
     P.O. Box 28297
     Nicosia CY2092, Cyprus
   (+357) 22 511007
  (+357) 22 496547